Project Description

OPF – ON-SHORE PROCESSING FACILITIES EXPANSION

GOALS

The COE project consisted in the expansion of the Chavyo On-shore processing facilities, in the framework of the Sakhalin 1 project. A first phase of the Project took place in 2005.

Sector: oil&gas
Year: 2010 – 2011
Location: Chayvo, Sakhalin Island (Russia)
Direct client: Renco Spa
Final client: Exxon Neftegas Limited

PRINCIPAL ACTIVITIES AND SOLUTIONS

The activity carried out by Trillini Engineering was divided into 2 main parts:

The engineering, procurement and prefabrication of two buildings, namely the Local Equipment Room and the Power Generation Building;
The support to the in situ installation of the engineered materials, purchased by the main contractor in the first phase of the project.
Here follows a in-detail description of the activities:

LER – Local Equipment Room

  • Basic design of HVAC system, of the electrical rooms, of the prefabricated container designed to accommodate the switchgear and the instrumentation for a future gas turbine installation;
  • Coordination of the interfacing between the various vendors during the prefabrication phase;
  • DCS + SIS – Distributed Control System;
  • UPS – Uninterruptible Power Supply;
  • Quadri elettrici MV-LV;
  • ECS – Electrical Control System;
  • Turbine;
  • Support for the testing and start-up activities of the HVAC and of the electro-instrumental systems, manufactured‚ in Italy, in Franzisella – Casciago (VA).

PGB – Power Generation Building

  • Design of the HVAC and of the pressurization systems for the buildings hosting the two 6 MW gas turbines;
  • Technical specifications, coordination of the purchasing activities and support for the FAT of the purchased equipment.

Features:

    • Design for saline environments and for a range of working temperatures of -44° to +32°C;
    • Control units with a SIL2 reliability (LER and PGB);
    • ATEX installations (PGB);
    • Basic and detailed design;
    • Drafting of purchase specifications;
    • Support to the purchase department and technological uniformity of economical offers;
    • Final acceptance tests (FAT);
    • Site preparation activities;
    • Standards: SNIP, GOST-R GOST-R + Fire.