Project Description

FIRE FIGHTING SYSTEM

GOALS

Punta Catalina project comprises two identical 2×360 MWe Coal Fired Power Plant (CFPP) with a capacity of 2×360 MWe.

The consortium Tecnimont – Odebrect – Estrella was the general contractor for the EPC construction of the Coal Fired Power Plant for the final client CDEEE Corporación Dominicana de Empresas Eléctricas Estatales.

Eusebi Impianti was awarded a contract for the complete design, manufacturing, supply, inspection, tests, painting, insulation, packing, assembly, commissioning, start-up, site testing, technical assistance, guaranty and performance guaranty of the fire fighting systems of the Coal Fired Power Plants.

Sector: oil&gas
Year: 2015 -2016
Location: Punta Catalina, Baní, Repubblica Dominicana
Direct client: Eusebi Impianti / Tecnimont Odebrect Estrella
Final client: Corporación Dominicana de Empresas Eléctricas Estatales (CDEEE)

PRINCIPAL ACTIVITIES

Trillini Engineering was in charge of Project Engineering Management and Engineering of the Fire Fighting Systems.

SOLUTIONS

Especially Trillini Engineering was responsible for the design of the following systems:

  • Clean Agent Fire Extinguishing Systems
  • CO2 Fire Extinguishing Systems
  • Water Spray Deluge Systems
  • Fire Sprinkler Systems

Clean Agent Fire Extinguishing Systems

The design of no. 22 Clean Agent System (Novec 1230) included the following activities and documentation: piping and instrument diagram, datasheet, general arrangement drawing, hydraulic calculation, isometric drawings, installation and operation manual, bill of material and spare part list, preservation procedure, piping supports design and seismic calculation, inspection and test plan, inspection and test procedure, manufacturing schedule, certification dossier, painting procedure, welding book.

CO2 Fire Extinguishing Systems

The design of no. 3 CO2 System included the following activities and documentation: piping and instrument diagram, datasheet, general arrangement drawing, hydraulic calculation, isometric drawings, installation and operation manual, bill of material and spare part list, preservation procedure, piping supports design and seismic calculation, inspection and test plan, inspection and test procedure, manufacturing schedule, certification dossier, painting procedure, welding book.

Water Spray Deluge Systems

The design of no. 20 Water Spray Deluge Systems included the following activities and documentation: piping and instrument diagram, datasheet, general arrangement drawing, hydraulic calculation, isometric drawings, installation and operation manual, bill of material and spare part list, preservation procedure, piping supports design and seismic calculation, inspection and test plan, inspection and test procedure, manufacturing schedule, certification dossier, painting procedure, welding book.

Fire Sprinkler Systems

The design of no. 3 Fire Sprinkler Systems included the following activities and documentation: piping and instrument diagram, datasheet, general arrangement drawing, hydraulic calculation, isometric drawings, installation and operation manual, bill of material and spare part list, preservation procedure, piping supports design and seismic calculation, inspection and test plan, inspection and test procedure, manufacturing schedule, certification dossier, painting procedure, welding book.